ID# 48
Investment proposal
Name of the project
|
Manufacture of sports shoes
|
Main goals of project
|
Ensuring domestic needs of the population and export
|
Sphere /industry
|
Leather and footwear industry
|
Implementation of schedule project
|
2020-2021
|
Location of the project
|
Andijan region
|
Information about participants of the project:
|
– initiator
|
“Uzcharmsanoat Association”
|
– co-executor (the lead sectorial of Ministry/authority/Department)
|
“Uzcharmsanoat Association”
|
– creditor
|
|
Total costs of project
|
3 mill. USD
|
Prospective source of financing:
|
– own funds
|
|
– credits
|
|
– the required volume of direct foreign investments
|
3 mill. USD
|
Composition of main costs
|
Breakdown of main costs:
– construction and installation work – 0.6 million USD
– basic equipment (including installation supervision and component parts, and transportation) – USD 2.0 million
– raw materials for the launch period (3-6 months) – 0.4 million USD
|
Predictable of profitability
|
20% (net profit of total income per year)
|
Predictable of payback period
|
4 years
|
Cash flows
|
|
Characteristics of the planned to production
|
Different types of sport shoes
|
Capacity of project/productivity
|
500 thousand pairs per year
|
Contribution to the project by the initiator
|
|
Current status of project
|
Under development
|
Information about the initiator of the project
Full name of the enterprises
|
Manufacture of sports shoes
“Uzcharmsanoat Association”
|
Position
|
Investment department
|
Contact phone number
|
+99871 207-95-55
|
Email adress
|
info@uzcharm.uz
|
Structure of founders and distribution of shares
|
|
Contact details of executor from MIFT
Full name
|
J.Vakhobov
|
Position
|
specialist
|
Contact phone number
|
71 238-51-05
|
Email adress
|
|
General information
Number and types of jobs created
|
200
|
Environmental impact statement (project EIS), which includes expected types and volumes of wastes, places of their utilization
|
|
Information about the land plot for the construction of the enterprise
|
1 hectar
|
Existing infrastructure
|
Electricity, gas and water
|
The required infrastructure
|
Electricity, gas and water
|
Upcoming construction and installation works
|
Required
|
Design and estimate documentation
|
Feasibility study required
|
Power requirement (kWh), installed capacity (kWh or megawatt hour)
|
70 thousand kWh
|
Demand for water (cub/m)
|
180 thousand m3
|
Gas demand (cu/m)
|
1 thousand m3
|
Market analysis, productions definition (works, services),marketing researches
Type of product
|
Production of sport shoes
|
Annual production (ton. year)
|
500 thousand pairs
|
Prospective markets sales and their shares:
|
Inner
|
60 % of production, 300 thousand pairs
|
Export
|
40 % production, 200 thousand pairs
|
Coasts of products
|
110 thousand soums
|
Demand for raw materials (per year)
|
40 million square meters leather
2.2 tons. fittings
|
Provision of raw materials
|
2 thousand tons polyurethane
|
Market volume
|
60 % internal 40 % external
|
Expected market share
|
CIS countries, Afghanistan and EU
|
Arch-rivals
|
|
Main competitive advantage
|
Quality and law prices
|
Main target groups of consumers
|
All aged customers
|
The structure of sales according to target groups of consumers
|
All aged customers
|
Pricing strategy
|
Market price
|
Cost structure of the final product
|
Net price, 15 % income
|
Availability of patents, licenses, certificates in accordance with the current legislation
|
|
The presence of a formed database of potential customers with a confirmed willingness to purchase products
|
Sports unions and complexes of the Republic of Uzbekistan
|
Presence of marketing research
|
Have
|
Presentation component of the project
|
Have
|
Additional information
|
Production of brand goods
|
Project risk
|
Have
|
Production technology and parameters of main equipment
Depends on the investor’s preferences
Type of equipment
|
Equipment for the production of sport shoes
|
Country of origin
|
Germany, Turkey and Italy
|
Performance
|
|
Cost
|
2.0 million dollars
|
Energy consumption
|
|
Installed capacity
|
700 thousand pairs
|
Overall size of equipment
|
|
Weight of main equipment
|
Depends from the equipment power
|
Node of main equipment (lines)
|
|
Number of working hours per year
|
3.0 thousand hours
|
Duty cycle
|
8 hours a day
|
Periodicity of the planned –warning repair (design and preparation works)
|
|
Number of people involved in the production process and their functions
|
50
|
STEP-BY-STEP, DESCRIPTION OF PRODUCTION TECHNOLOGY
(Show schematically)