Depends on the investor’s preferences
Type of equipment
|
Metalworking machines, including CNC
|
Country of origin
|
South Korea, Japan, Germany.
|
Performance
|
300 units snap-in per year
|
Cost
|
The total cost of equipment is 1.8 million dollars
|
Energy consumption
|
Different
|
Installed capacity
|
Total installed power: 496 kW
|
Overall dimensions of the equipment
|
Wire EDM Machine 2.8 x 4.1 m
Electro erosion drilling machine 1.9 x 1.7 m.
CNC milling center 7 mx 7 m.
Radial drilling machine 2.5 x 1.07 m.
Milling machine 5.7 x 4.7 m.
Circular grinding machine 2.8 x 1.8 m
Welding machine 1 x 1 m.
Argon welding 1 x 1 m.
Granite slab (table) 1×1,5 m
Hardening furnace 2.1 x 1.5 m.
Hardening furnace 0.62 x 0.52 m.
Mechanical crank press 1.5 x 2.8 m.
Mechanical crank press 1.5 x 2.8 m.
Mechanical crank press 1.5 x 2.8 m.
Overhead crane
|
Weight of main equipment
|
Wire EDM machine
Electro erosion Drilling Machine
CNC milling center
Radial drilling machine
Milling machine
Round grinding machine
|
Node of main equipment (lines)
|
Welding machine
Argon welding
Granite slab (table)
Hardening furnace
Mechanical crank press
Mechanical crank press
Mechanical crank press
Overhead crane
|
Number of working hours per year
|
3840 hours
|
Duty cycle
|
1. Cutting blanks for the manufacture of a set of stamp
2. Grinding blanks for the manufacture of a set of stamp
3. Processing of blanks on the CNC milling machine
4. Turning cylindrical conical billets
5. Heat treatment of work pieces parts
6. Joint processing of parts on electro erosive machines
7. Final grinding and polishing of parts of a set of stamps.
8. Control of the geometric dimensions of parts, according to the documentation.
9. Assembly and fitting die tooling according to the drawing
10. Check (try-out) die tooling for suitability
11. Completion of the nodes of the stamp if necessary
12. Final control painting, stamp packaging
|
Periodicity of the planned –warning repair (design and preparation works)
|
According to the schedule of PPR for each machine
|
Number of people involved in the production process and their functions
|
Head of the workshop – 1 person, Design Engineer – 2 people, Technological Engineer – 2 people, Economist-planner – 1 person, Engineer-programmer of CNC – 1 person, Warehouse Manager – 1 person, Master 1 – person. CNC operator – 2 people. Gas cutter 1 person Thermist – 4 people. Electroerosionist – 2 people. Milling machine operator – 1 person. Grinder – 1 person. Turner 1 – pers., Controller – 1 people. Toolmaker – 5 people.
|
STEP-BY-STEP, DESCRIPTION OF PRODUCTION TECHNOLOGY
(Show schematically)