×

Construction in Uzbekistan of an experimental 16-storey residential building

Инвестиционное предложение
doc
Презентация проекта
ppt

INVESTMENT PROPOSAL

Project

Construction of an experimental 16-storey residential building in Uzbekistan.

Project goal

More efficient use of the construction site, as well as increasing the skills and professionalism of construction workers in the territory of Uzbekistan.

Sphere/industry

Construction

Project implementation schedule

2019-2020

Project implementation location

Republic of Uzbekistan, Tashkent city

Information about project participants:

 

– initiator

LLC «Uzshahar qurilish invest»

– co-executor (in charge of the sectorial authority/ministry/agency)

Not provided

– creditor

In search

Project amount

about 390 000 million UZS/47 million USD

Expected financing sources

Providing mortgage loans for the population for a period of 20 years with a grace period of 5 years with a minimum interest rate

– own funds

– loans

– required amount of foreign direct investment

Main costs composition

                              

Expected profitability

High

Expected payback period

20 years

Cash flow          

(to be specified at the stage of development of pre-project/project documentation.)

Characteristics of products planned for production

Affordable houses for the population

Project capacity/productivity

20 houses/1600 apartments

Contribution to the project by the initiator

(to be specified at the stage of development of pre-project/project documentation.)

Current project status

The project implementation concept is under preparation.

 

Information about the project initiator

 

Company         

LLC «Uzshahar qurilish invest»

Details, address, contacts

Phone: 236 49 48

Fax: 236 48 83

e-mail: qurilishinvest@umail.uz

Date of the company’s foundation

26.01.2017

Statutory fund

1 000 000 000 UZS

Founders and distribution of shares

Fund for Reconstruction and Development of the Republic of Uzbekistan (61%)

JSC «Uzmetkombinat» (10%)

JSC «Kizilkumcement» (10%)
NEIIC «Uzbekinvest» (10%)

JSIB «Ipoteka Bank» (10%)

 

Information about the founders

 

Name

Date of birth

Contact number

e-mail

 

Executor’s contacts from the MIFT

 

Name

 

Position

 

Contact number

 

e-mail           

 

GENERAL INFORMATION

Number and types of created jobs

2000 jobs during the construction period

Information about the land for construction of the enterprise

(to be specified at the stage of development of pre-project/project documentation.)

Existing infrastructure

More than 3 years of experience in construction industry.

Required infrastructure

LLC «Uzshahar qurilish invest» has necessary engineering and communication infrastructure.

Upcoming construction and installation work

Construction of an experimental 16-storey residential building in Uzbekistan.

Design and estimate documentation

Available.

Electric power requirement (kW/h), installed power (kW/h or mW/h

According to the figures specified in the estimate, drawn up with the contractor prior to construction.

Water requirement (m cube)

Gas requirement (m cube)

 

MARKET ANALYSIS, PRODUCT DESCRIPTION (WORKS, SERVICES)

MARKETING RESEARCH

Types of products

Affordable houses for the population of Uzbekistan

Annual production

Estimated sales markets and their shares:

(to be specified at the stage of development of pre-project/project documentation.)

Import

Export      

Production cost

According to the expert opinion of the State Expertise of the Republic of Uzbekistan.

Need for raw materials (per year)

Provision with raw materials

Market volume

(to be specified at the stage of development of pre-project/project documentation.)

Expected market share

Main competitors

Private construction organizations

Main competitive advantages

(to be specified at the stage of development of pre-project/project documentation.)

Main target groups of consumers

Population of the Republic of Uzbekistan

Sales structure by target consumer groups

Creating more affordable living conditions for the population

Pricing strategy

On a preferential basis in accordance with the Resolution of the President of the Republic of Uzbekistan No.RP-2660 of November 22, 2016

Final product cost structure

Patents, licenses, certificates in accordance with the current legislation

Contracting organizations have necessary permits for conducting their activities.

Formed base of potential customers with a confirmed willingness to purchase products

Existing contracting organizations in Uzbekistan

Marketing research

Available.

Presentation component of the project

Additional information

Project risks

(to be specified at the stage of development of pre-project/project documentation.)

 

PRODUCTION TECHNOLOGY

AND BASIC EQUIPMENT PARAMETERS

 

Type of equipment

All construction materials, machines and mechanisms, as well as equipment for construction to be described in the project estimate, as well as in the price approval protocol (an appendix is available).

Country of origin

Productivity

Price

Energy consumption

Installed power

Overall dimensions of the equipment

Main equipment weight

Main equipment units (lines)

Working hours per year

Duty cycle

Frequency of conducting the planned preventive maintenance (PPM)

Number of people involved in the production process and their functions

(to be specified at the stage of development of pre-project/project documentation.)