×
Инвестиционное предложение
doc
Презентация проекта
ppt
Investment proposal
  

Name of the project

Online 3d base

Main goals of project

training and creating turnkey solutions

Sphere /industry

 

Implementation of schedule project

 

Location of the project

 

Information about participants of the project:

– initiator

LLC “Symbiotic Solutions Community”

– co-executor (the lead sectorial of Ministry/authority/Department)

Ministry of Development of Information Technologies and Communications
Republic of Uzbekistan

– creditor

 

Total costs of project

150 000 $

Prospective source of financing:

– own funds

30 000 $

– credits

0

– the required volume of direct foreign investments

120 000$

Composition of main costs

Equipment, Salary for employees, Support and development of the base.

Predictable of profitability

30%

Predictable of payback period

18 months

Cash flows

Years

2018

2019

 

 

 

Operating income (million UZB)

320

180

 

 

 

Operating expenses (million UZB)

220

70

 

 

 

Characteristics of the planned to production

3d models of popular cultural objects in the field of tourism, historical places. Various requisites for the cinema and videos.

Capacity of project/productivity

2000 models per year

Contribution to the project by the initiator

300 million UZB

Current status of project

In the process; recruitment and training

Information about the initiator of the project
 

Full name of the enterprises

LLC “Symbiotic Solutions Community”

 Requisites, email, contacts

Tashkent city, Mirabad district. Intersection of Bukhara and Nuroniylar Streets

JSCB Turonbank Yunusobod branch

  Ac.Nom 20208000300831357001

 INN  305190419

Date foundation of enterprises

December 2017

Statutory fund and

20 million UZB

Structure of founders and distribution of shares

 

Information about the founders
 

Number and types of jobs created

 

Environmental impact statement (project EIS), which includes expected types and volumes of wastes, places of their utilization

 

Information about the land plot for the construction of the enterprise

 

Existing infrastructure

 

The required infrastructure

 

Upcoming construction and installation works

 

Design and estimate documentation

 

Power requirement (kWh), installed capacity (kWh or megawatt hour)

 

Demand for water (cub/m)

 

Gas demand (cu/m)

 

Market analysis, productions definition (works, services),marketing researches
  

Type of product

 

Annual production (ton. year)

 

Prospective markets sales and their shares:

Inner

 

Export

 

Costs of products

 

Demand for raw materials (per year)

 

Provision of raw materials

 

Market volume

 

Expected market share

 

Arch-rivals

 

Main competitive advantage

 

Main target groups of consumers

 

The structure of sales according to target groups of consumers

 

Pricing strategy

 

Cost structure of the final product

 

Availability of patents, licenses, certificates in accordance with the current legislation

 

The presence of a formed database of potential customers with a confirmed willingness to purchase products

 

Presence of marketing research

Nasritdinov Aziz Adihamjonovich – 100%

Presentation component of the project

 

Additional information

 

Project risk

 
Production technology and parameters of main equipment
  

Depends on the investor’s preferences

Type of equipment

Computer Engineering. Computers

Country of origin

China-USA

Performance

 

Cost

 50 000$

Energy consumption

40kW / hour

Installed capacity

40kW

Overall size of equipment

1meter*1m*1m

Weight of main equipment

15Kg

Node of main equipment (lines)

 

Number of working hours per year

 

Duty cycle

 

Periodicity of the planned –warning repair (design and preparation works)

 

Number of people involved in the production process and their functions

 

 

STEP-BY-STEP, DESCRIPTION OF PRODUCTION TECHNOLOGY

(Show schematically)