Investment offer
Name of the project |
Production of the 15 tons of black caviar |
Initiator |
Determined at the stage of the feasibility study |
Location of the project |
Determined at the stage of the feasibility study |
Cost of the project |
18 217 239 $ |
Initiator’s input |
7 837 239,47 $ |
Required FDI |
10 380 000 $ |
Other source of financing |
|
Annual capacity of the project |
|
Average annual income from sales |
|
Annual NET profit |
|
Existing infrastructure |
Determined at the stage of the feasibility study |
Existing land plot |
Determined at the stage of the feasibility study |
Export |
90% |
Number and types of jobs created | More than 50 |