Investment proposal
Name of the project
|
Organization of a crushed stone plant
|
Main goals of project
|
Use of existing natural stone deposits and organization of crushed stone production
|
Sphere /industry
|
Industry
|
Implementation of schedule project
|
2019-2020
|
Location of the project
|
Surkhandarya region, Baysun district.
|
Information about participants of the project:
|
– initiator
|
SP “Akbarshokh Boysuniy”
|
– co-executor (the lead sectorial of Ministry/authority/Department)
|
|
– creditor
|
|
Total costs of project
|
420 thousand USD
|
Prospective source of financing:
|
– own funds
|
100 thousand US dollars
|
– loans of commercial banks
|
100 thousand US dollars
|
– the required volume of direct foreign investments
|
220 thousand US dollars
|
Composition of main costs
|
Equipment – 420 thousand US dollars
|
Projected profitability
|
30 %
|
Projected payback period
|
3 years
|
Cash flows
|
Years
|
|
|
|
|
|
Operating income
|
|
|
|
|
|
Operating expenses
|
|
|
|
|
|
|
Characteristics of the planned production
|
Crushed stone sizes of 0-5, 5-20, 20-40 for construction work.
|
Capacity of project/productivity
|
400 m3 a day
|
Contribution to the project by the initiator
|
Project business plan, land, organizational issues
|
Current status of project
|
Being developed
|
Information about the initiator of the project
Full name of the enterprises
|
SP “Akbarshosh Boysuniy”
|
Requisites, email, contacts
|
Surkhandarya region, Baysun district, st. At-Termizy, Tel: +998915802299
|
Foundation date of the enterprise
|
2004 y.
|
Statutory fund
|
|
Structure of founders and distribution of shares
|
100%
|
Information about the founders
Full name |
Allakulova Khurshida Abduraimovna
|
Contact number |
+99891 5802299
|
Email address |
|
Contact of the performer from the MIFT
Full name
|
|
Position
|
|
Contact number
|
|
Email address
|
|
General information
Number and types of jobs created
|
15-20.
|
Environmental impact statement (project EIS), which includes expected types and volumes of waste, places of their utilization
|
The project does not affect the environment.
|
Information about the land plot for the construction of the enterprise
|
Land plot allocated
|
Existing infrastructure
|
– Electricity of the net
– water supply networks
– car roads
|
The required infrastructure
|
Updating the lines of electrical networks.
|
Upcoming construction and installation works
|
It will definitely be based on the development of a business plan / feasibility study for the project.
|
Designed-estimated documentation
|
There is none. Development required.
|
Power requirement (kWh), installed capacity (kWh or megawatt hour)
|
10 thousand kW / s.
|
Demand for water (cub/m)
|
1000 m3 / m.
|
Gas demand (cu/m)
|
|
Market analysis, productions definition (works, services),marketing researches
Type of product
|
Crushed stone sizes of 0-5, 5-20, 20-40 for construction work.
|
Annual production (ton. year)
|
80-90 thousand cubic meters.
|
Prospective markets sales and their shares:
|
Domestic
|
100%
|
Export
|
|
Costs of products
|
1 cube of crushed stone 70-80 thousand sum (9-10 US dollars)
|
Demand for raw materials (per year)
|
1,200,000 tons of stones
|
Provision of raw materials
|
|
Market volume
|
15%
|
Expected market share
|
There is none
|
Main competitors
|
Cheap raw materials
|
Main competitive advantage
|
Construction companies and all categories of population
|
Main target groups of consumers
|
100%
|
The structure of sales according to target groups of consumers
|
75% – construction companies
25% – all categories of the population
|
Pricing strategy
|
Market price
|
Cost structure of the final product
|
Raw 12.0%
Depreciation 8.0%
Other costs 20.0%
Salary 30.0%
Markup 30.0%
|
Availability of patents, licenses, certificates in accordance with the current legislation
|
There is none
|
The presence of a formed database of potential customers with a confirmed willingness to purchase products
|
Domestic market
|
Presence of marketing research
|
Is available
|
Presentation component of the project
|
There is none
|
Additional information
|
|
Project risks
|
– the risk of failure to comply with the established parameters of the Business Plan in terms of the planned revenue;
– the risk of increasing construction time with untimely financing of the project;
– the risk of unforeseen political and economic phenomena in the world economy, changes in the world price situation for raw materials, materials and components, as well as for finished products
|
Production technology and parameters of main equipment
Depends on the investor's preferences
Type of equipment
|
Crushing lines
|
Country of origin
|
China
|
Performance
|
500.0 thousand tons of crushed stone
|
Cost
|
420 thousand USD
|
Energy consumption
|
9500 kVA / s
|
Installed capacity
|
1 s / 500 m
|
Overall size of equipment
|
6-30
|
Weight of main equipment
|
25 tone.
|
Node of main equipment (lines)
|
Crushing lines
|
Number of working hours per year
|
2495 hour
|
Duty cycle
|
1 shift
|
Periodicity of the planned –warning repair (design and preparation works)
|
Every quarter
|
Number of people involved in the production process and their functions
|
15-20.
|
STEP-BY-STEP, DESCRIPTION OF PRODUCTION TECHNOLOGY
(Show schematically)