Projects implemented at the expense of loans guaranteed by the state and at the expense of FRDU

Industry

Region
Navoiy Region
Tashkent Region
Fergana region

Terms of implementation
2018-2021

Initiator
LLC IC "QISHLOQ QURILISH INVEST"

District

Total cost of the project
50 000 000 USD

Project capacity

2606

Foreign partner / creditor

Saudi Fund for Development

Industry

Region
Andijan region
Bukhara Region
Jizzakh Region
Navoiy Region
Namangan Region
Sirdaryo viloyati

Terms of implementation
2017-2021

Initiator
LLC IC "QISHLOQ QURILISH INVEST"

District

Total cost of the project
321 350 000 USD

Project capacity

6404

Foreign partner / creditor

Islamic Development Bank

Industry

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2021

Initiator
LLC IC "QISHLOQ QURILISH INVEST"

District

Total cost of the project
2 446 000 000 USD

Project capacity

29000

Foreign partner / creditor

Asian Development Bank

Industry

Region

Terms of implementation
2016-2020

Initiator
Uzbekistan Airways

District

Total cost of the project
552 661 846 USD

Project capacity

Four Boeing 787-8 aircrafts

Foreign partner / creditor

Industrial and Commercial Bank of China, FRDU

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2020

Initiator
Ipak Yo'li Bank

District
All districts of the project zone

Total cost of the project
38 000 000 USD

Project capacity

Supporting development of small business and private entrepreneurship

Foreign partner / creditor

ADB

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2021

Initiator
Hamkorbank

District
All districts of the project zone

Total cost of the project
45 000 000 USD

Project capacity

Financing small business projects

Foreign partner / creditor

ADB

Industry
Social sphere

Region
Andijan region
Samarqand Region
Tashkent Region

Terms of implementation
2016-2019

Initiator
Ministry of Health

District
Mirabad, Olmazor, Yunusabad, Mirzo Ulugbek districts, Samarkand city, Andijan city.

Total cost of the project
51 300 000 USD

Project capacity

Equipment and training

Foreign partner / creditor

KFAED

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2015-2019

Initiator
Ministry of Health

District
All districts of the project zone

Total cost of the project
28 470 000 USD

Project capacity

Equipment and training

Foreign partner / creditor

IDB

Industry
Social sphere

Region
Tashkent Region

Terms of implementation
2014-2019

Initiator
Ministry of Health

District
Chilanzar, Mirabad, Yunusabad districts

Total cost of the project
42 500 000 USD

Project capacity

Equipment and training

Foreign partner / creditor

SFR

Industry
Social sphere

Region

Terms of implementation
2014-2019

Initiator
Ministry of Health

District
Yashnabad district

Total cost of the project
102 840 000 USD

Project capacity

Construction, equipment and training

Foreign partner / creditor

Korea Eximbank

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2013-2019

Initiator
Ministry of Health

District
All districts of the project zone

Total cost of the project
83 220 000 USD

Project capacity

Equipment and training

Foreign partner / creditor

IDB

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2011-2019

Initiator
Ministry of Health

District
All districts of the project zone

Total cost of the project
254 500 000 USD

Project capacity

Equipment and training

Foreign partner / creditor

IDA

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2020

Initiator
Ministry of Higher and Secondary Special Education

District
All districts of the project zone

Total cost of the project
56 915 000 USD

Project capacity

supply of laboratory equipment

Foreign partner / creditor

IDB

Industry
Social sphere

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2022

Initiator
Ministry of Higher and Secondary Special Education

District
All districts of the project zone

Total cost of the project
72 952 000 USD

Project capacity

delivery of laboratory and IT equipment, other purchases

Foreign partner / creditor

IDA

Industry

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2021

Initiator
State Committee of the Republic of Uzbekistan on Land Resources, Geodesy, Cartography and State Cadaster

District
All districts of the project zone

Total cost of the project
25 000 000 USD

Project capacity

creation of an information system

Foreign partner / creditor

World Bank

Industry
Road transport infrastructure

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2021

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
227 822 000 USD

Project capacity

Credit line

Foreign partner / creditor

IDA, IBRD 

Industry
Road transport infrastructure

Region
Republic of Karakalpakstan
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Navoiy Region
Namangan Region
Samarqand Region
Surkhandarya region
Sirdaryo viloyati
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2016-2020

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
240 984 000 USD

Project capacity

the price of created production funds is 204.3 million USD

Foreign partner / creditor

ADB

Industry
Road transport infrastructure

Region
Jizzakh Region
Kashkadarya region

Terms of implementation
2017-2022

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
40 566 300 USD

Project capacity

The annual volume of production (milk) - 40 732.9 tons

Foreign partner / creditor

IFAD

Industry
Road transport infrastructure

Region
Republic of Karakalpakstan
Bukhara Region
Navoiy Region
Khorezm Region

Terms of implementation
2017-2021

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
20 710 000 USD

Project capacity

the price of created production funds is 17.16 million USD

Foreign partner / creditor

IDA

Industry
Road transport infrastructure

Region
Samarqand Region
Fergana region
Khorezm Region

Terms of implementation
2015-2021

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
219 280 330 USD

Project capacity

the price of created production funds is 185,36 million USD

Foreign partner / creditor

IBRD

Industry
Road transport infrastructure

Region
Surkhandarya region

Terms of implementation
2014-2019

Initiator
Ministry of Agriculture and Water Resources

District
All districts of the project zone

Total cost of the project
28 337 100 USD

Project capacity

annual production volume is 14.3 thousand tons of fruits and vegetables

Foreign partner / creditor

IFAD

Industry

Region

Terms of implementation
2015-2019

Initiator
Tashkent City Khokimiyat

District
All districts of the project zone

Total cost of the project
92 251 000 USD

Project capacity

960 thousand tons of MSW per year

Foreign partner / creditor

ADB

Industry
Agriculture and Water Management

Region
Republic of Karakalpakstan
Bukhara Region
Kashkadarya region
Namangan Region
Samarqand Region

Terms of implementation
2017-2020

Initiator
Qishloq Qurilish Bank together with IC LLC Qishloq Qurilish Invest

District
All districts of the project zone

Total cost of the project
300 000 000 USD

Project capacity

residential construction loans

Foreign partner / creditor

IDB

Industry

Region
Republic of Karakalpakstan
Bukhara Region
Kashkadarya region
Namangan Region
Samarqand Region
Surkhandarya region
Tashkent Region
Fergana region
Khorezm Region

Terms of implementation
2017-2021

Initiator
Qishloq Qurilish Bank together with IC LLC Qishloq Qurilish Invest

District
All districts of the project zone

Total cost of the project
500 000 000 USD

Project capacity

residential construction loans

Foreign partner / creditor

ADB

Industry
Сonstruction

Region
Andijan region
Namangan Region
Tashkent Region
Fergana region

Terms of implementation
2016-2021

Initiator
Ministry of Housing and Communal Services

District
23 districts: Zangiota, Pskent, Urtachirchik, Yangiyul, Ulugnor, Oltinkul, Kurgontepa, Khujaobod, Asaka, Markhamat, Pop, Chust, Uychi, Uchkurgon, Kasansay, Yangikurgan, Norin, Besharik, Dangara, Furkat, Uchkuprik, Kushtepa, Buvayda

Total cost of the project
240 000 000 USD

Project capacity

376 km

Foreign partner / creditor

World Bank

Industry
Agriculture and Water Management

Region
Sirdaryo viloyati

Terms of implementation
2017-2021

Initiator
Ministry of Housing and Communal Services

District
Gulistan city, Shirin and Yangiyer

Total cost of the project
76 768 500 USD

Project capacity

39 thousand m3/d

Foreign partner / creditor

IDB

Industry
Agriculture and Water Management

Region
Bukhara Region
Samarqand Region

Terms of implementation
2016-2019

Initiator
Ministry of Housing and Communal Services

District
Bukhara and Samarkand regions

Total cost of the project
191 898 400 USD

Project capacity

272,9 thousand m3/d

Foreign partner / creditor

IDA

Industry
Agriculture and Water Management

Region
Sirdaryo viloyati

Terms of implementation
2011-2019

Initiator
Ministry of Housing and Communal Services

District
Bayavut, Khavast, Mirzaabad, Sardoba and Oqoltin districts

Total cost of the project
138 646 290 USD

Project capacity

70 thousand m3/d

Foreign partner / creditor

IDA

Industry
Agriculture and Water Management

Region
Tashkent Region

Terms of implementation
2017-2021

Initiator
Ministry of Housing and Communal Services

District
Kibray and Zangiata districts

Total cost of the project
143 828 100 USD

Project capacity

105 thousand m3/d

Foreign partner / creditor

ADB

Industry

Region
Jizzakh Region

Terms of implementation
2016-2020

Initiator
Ministry of Housing and Communal Services

District
Jizzakh city

Total cost of the project
91 000 000 USD

Project capacity

30,0 thousand m3/d

Foreign partner / creditor

ADB

Industry
Сonstruction

Region
Tashkent Region

Terms of implementation
2017-2021

Initiator
JSC Uzbekistan Railways

District
Kibray, Zangiata, Tashkent, Bektemir, Sergeli, Yunusabad, Chilanzar, Uchtepa, Shayhantahur, Almazar, Mirzo-Ulugbek, Yashnabad

Total cost of the project
422 300 000 USD

Project capacity

52,1 km

Foreign partner / creditor

China Eximbank

Industry

Region
Andijan region
Bukhara Region
Jizzakh Region
Kashkadarya region
Namangan Region
Samarqand Region
Surkhandarya region
Tashkent Region
Fergana region

Terms of implementation
2016-2022

Initiator

District
All areas of the project area

Total cost of the project
292 USD

Project capacity

replacement of outdated equipment.

Foreign partner / creditor

The World Bank

Industry
Road transport infrastructure

Region
Kashkadarya region

Terms of implementation
2017-2019

Initiator
Ministry of Water Resources

District
Karshi city

Total cost of the project
115 900 000 USD

Project capacity

Reconstruction of the cascade of pumping stations with an increase in water supply through the Karshi main canal to 5.05 km3/year due to replacement and purchase of pumping units 9, dredgers 4 units. and etc.

Foreign partner / creditor

Industry
Road transport infrastructure

Region
Andijan region
Namangan Region
Fergana region

Terms of implementation
2017-2024

Initiator
Ministry of Water Resources

District
Chortok, Fergana, Altyarik, Tashlak, Kuvasay, Yangikurgan, Kurgantepa, Khujaabad, Jalakuduk, Bulakbashi districts and Kuva city

Total cost of the project
10 000 000 USD

Project capacity

Improvement of water supply of irrigated land on an area of 103.87 thousand hectares

Foreign partner / creditor

IDA

Industry
Road transport infrastructure

Region
Surkhandarya region

Terms of implementation
2015-2019

Initiator
Ministry of Water Resources

District
Surkhandarya region

Total cost of the project
122 700 000 USD

Project capacity

Providing guaranteed water supply to the land of existing irrigation on an area of 103.4 thousand hectares

Foreign partner / creditor

IDB

Industry
Road transport infrastructure

Region
Bukhara Region
Navoiy Region

Terms of implementation
2014-2020

Initiator
Ministry of Water Resources

District
Kagan, Alat, Kyzyltepa districts

Total cost of the project
406 300 000 USD

Project capacity

Improve the water supply of irrigated land by 315 thousand hectares

Foreign partner / creditor

ADB, JICA

Industry

Region
Samarqand Region

Terms of implementation
2017-2021

Initiator
Khokimiyat of Samarkand region

District
Samarkand city

Total cost of the project
42 140 000 USD

Project capacity

Collection and recycling 360 thousand tons of municipal solid waste per yearд

Foreign partner / creditor

French Development Agency (FDA)

Industry

Region
Kashkadarya region

Terms of implementation
2011-2019

Initiator
Republican road fund

District
Guzar, Chirakchi districts

Total cost of the project
113 600 000 USD

Project capacity

35 km

Foreign partner / creditor

SFR, KFAER

Industry

Region
Bukhara Region

Terms of implementation
Bukhara, Jandar, Peshkun, Romitan districts

Initiator
Republican road fund

District
Bukhara region

Total cost of the project
230 000 000 USD

Project capacity

87 km

Foreign partner / creditor

ADB

Industry

Region
Tashkent Region

Terms of implementation
2016-2020

Initiator
Uzbekistan Airways

District
Tashkent city

Total cost of the project
430 000 000 USD

Project capacity

5.7 million pass. per year (gradually by 2030.)

Foreign partner / creditor

"EDCF" (Republic of Korea), Korea Eximbank

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekistan Railways

District
Kibray district

Total cost of the project
140 000 000 USD

Project capacity

40 takeoffs and landings per day

Foreign partner / creditor

Foreign banks

Industry

Region
Tashkent Region

Terms of implementation
2017-2021

Initiator
Uzbekistan Railways

District
Angren city

Total cost of the project
59 200 000 USD

Project capacity

Purchase of railway equipment and components

Foreign partner / creditor

Industry

Region
Tashkent Region

Terms of implementation
2017-2021

Initiator
Uzbekistan Railways

District
Angren city

Total cost of the project
47 800 000 USD

Project capacity

Replacing worn equipment

Foreign partner / creditor

Industry

Region
Surkhandarya region

Terms of implementation
2017-2020

Initiator
Uzbekistan Railways

District
Sariasiya district

Total cost of the project
105 510 000 USD

Project capacity

Сoal mining up to 900 thousand tons per year

Foreign partner / creditor

Eximbank PRC/ CDB PRC

Industry

Region
Tashkent Region

Terms of implementation
2017-2020

Initiator
Uzbekistan Railways

District
Sergeli district

Total cost of the project
170 100 000 USD

Project capacity

7,1 km

Foreign partner / creditor

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekistan Railways

District
Yunusabad district

Total cost of the project
124 800 000 USD

Project capacity

2,9 km

Foreign partner / creditor

Industry

Region
Andijan region
Namangan Region
Tashkent Region
Fergana region

Terms of implementation
2013-2019

Initiator
Uzbekistan Railways

District
Akhangaran, Pap, Buvayda, Kokand, Fergana, Margilam, Markhamat, Andijan

Total cost of the project
1 410 770 000 USD

Project capacity

124,14 km

Foreign partner / creditor

Eximbank PRC/MBRD

Industry

Region
Andijan region
Namangan Region

Terms of implementation
2017-2021

Initiator
Uzbekistan Railways

District
Pap, Chust, Uychi, Khakkulabad, Uchkurgan, Pakhtaabad, Izbaskan, Andijan districts, Namangan and Andijan cities

Total cost of the project
187 640 000 USD

Project capacity

145,1 km

Foreign partner / creditor

ADB

Industry
Chemical industry

Region
Navoiy Region

Terms of implementation
2015-2019

Initiator
Uzkimyosanoat JSC

District
Navoi city

Total cost of the project
216 580 000 USD

Project capacity

Weak nitric acid - 500 thousand tons

Foreign partner / creditor

Commerzbank (Germany), «Credit Suisse» (Switzerland) /Company "CASALE SA" (Switzerland)

Industry
Chemical industry

Region
Navoiy Region

Terms of implementation
2016-2020 гг.

Initiator
Uzkimyosanoat JSC

District
Navoi city

Total cost of the project
985 740 000 USD

Project capacity

ammonia - 660 thousand tons;
carbamide - 577.5 thousand tons

Foreign partner / creditor

JBIC/
Company "Mitsubishi Heavy Industries" и "Mitsubishi Corporation" (Japan)

Industry

Region
Jizzakh Region

Terms of implementation
2017-2020

Initiator
Almalyk MMC

District
Forij district

Total cost of the project
68 000 000 USD

Project capacity

Mining and processing of 500.0 thousand tons of ore

Foreign partner / creditor

Industry

Region
Tashkent Region

Terms of implementation
2017-2023

Initiator
Almalyk MMC

District
Almalyk city

Total cost of the project
420 000 000 USD

Project capacity

Mining 2.0 million tons of ore

Foreign partner / creditor

Industry

Region
Tashkent Region

Terms of implementation
2017-2027

Initiator
Almalyk MMC

District
Almalyk city

Total cost of the project
1 696 200 000 USD

Project capacity

Mining 23 million tons of ore

Foreign partner / creditor

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Almalyk MMC

District
Almalyk city

Total cost of the project
138 100 000 USD

Project capacity

Bringing production to 40.5 million tons of ore (an additional 5.3 million tons of ore)

Foreign partner / creditor

Industry

Region
Samarqand Region

Terms of implementation
2017-2024

Initiator
Navoi MMC

District
Koshrabad district

Total cost of the project
336 900 000 USD

Project capacity

Given

Foreign partner / creditor

Industry

Region
Navoiy Region

Terms of implementation
2018-2023

Initiator
Navoi MMC

District
Tomdi district

Total cost of the project
155 000 000 USD

Project capacity

Given

Foreign partner / creditor

Industry

Region
Navoiy Region

Terms of implementation
2018-2021

Initiator
Navoi MMC

District
Tomdi district

Total cost of the project
153 400 000 USD

Project capacity

Given

Foreign partner / creditor

Industry

Region
Navoiy Region

Terms of implementation
2016-2026

Initiator
Navoi MMC

District
Tomdi district

Total cost of the project
822 800 000 USD

Project capacity

Given

Foreign partner / creditor

Industry

Region
Navoiy Region

Terms of implementation
2017-2022

Initiator
Navoi MMC

District
Tomdi district

Total cost of the project
396 000 000 USD

Project capacity

Given

Foreign partner / creditor

Industry

Region
Sirdaryo viloyati

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Shirin city

Total cost of the project
72 300 000 USD

Project capacity

Power increase to 127 MW

Foreign partner / creditor

Russian government-owned development bank

Industry

Region
Andijan region

Terms of implementation
2017-2020

Initiator
Uzbekgidroenergo JSC

District
Asaka district

Total cost of the project
19 100 000 USD

Project capacity

Power increase to 7,05 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Yunusabad district

Total cost of the project
26 700 000 USD

Project capacity

Power increase to 16,6 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Kibray district

Total cost of the project
27 600 000 USD

Project capacity

Power increase to 15,34 MW

Foreign partner / creditor

Eximbank (PRC)

Industry
Electrotechnical sphere

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Zangiata district

Total cost of the project
31 600 000 USD

Project capacity

Power increase to 15 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Tashkent Region

Terms of implementation
2017-2020

Initiator
Uzbekgidroenergo JSC

District
Chirchik city

Total cost of the project
22 600 000 USD

Project capacity

8,0 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Andijan region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Asaka district

Total cost of the project
5 200 000 USD

Project capacity

Power increase to 7,05 MW

Foreign partner / creditor

IDA

Industry

Region
Surkhandarya region

Terms of implementation
2017-2020

Initiator
Uzbekgidroenergo JSC

District
Sariasiya district

Total cost of the project
80 390 000 USD

Project capacity

69,0 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Namangan Region

Terms of implementation
2018-2021

Initiator
Uzbekgidroenergo JSC

District
Pap district

Total cost of the project
27 200 000 USD

Project capacity

18,0 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Namangan Region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Uchkurgan district

Total cost of the project
25 900 000 USD

Project capacity

12,0 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Tashkent Region

Terms of implementation
2017-2019

Initiator
Uzbekgidroenergo JSC

District
Urta Chirchik district

Total cost of the project
15 900 000 USD

Project capacity

12,0 MW

Foreign partner / creditor

Eximbank (PRC)

Industry

Region
Republic of Karakalpakstan

Terms of implementation
2015-2020

Initiator
Uzbekenergo JSC

District
Takhiatash district

Total cost of the project
678 300 000 USD

Project capacity

2х250 MW

Foreign partner / creditor

ADB

Industry

Region
Namangan Region

Terms of implementation
2015-2020

Initiator
Uzbekenergo JSC

District
Turakurgan district

Total cost of the project
1 195 900 000 USD

Project capacity

2х450 MW

Foreign partner / creditor

JICA

 

Industry

Region
Navoiy Region

Terms of implementation
2015-2019

Initiator
Uzbekenergo JSC

District
Karmana district

Total cost of the project
547 300 000 USD

Project capacity

450 MW

Foreign partner / creditor

JICA

Industry

Region
Republic of Karakalpakstan
Khorezm Region

Terms of implementation
2016-2019

Initiator
Uzbekenergo JSC

District
Khodjeyli, Khazarasp district

Total cost of the project
258 500 000 USD

Project capacity

220 kV overhead line
364 km

Foreign partner / creditor

ADB

Industry
Housing Infrastructure

Region
Kashkadarya region

Terms of implementation
2016-2020

Initiator
Uzbekneftegas JSC

District
Guzar district

Total cost of the project
1 000 000 000 USD

Project capacity

280 thousand tons of polyethylene, 100 thousand tons of polypropylene

Foreign partner / creditor

«Gazprombank» (Russia)

Industry
Housing Infrastructure

Region
Jizzakh Region

Terms of implementation
2017-2020

Initiator
Uzbekneftegas JSC

District
Zafarabad district

Total cost of the project
2 200 000 000 USD

Project capacity

Processing of 5 million tons of oil

Foreign partner / creditor

«Gazprombank» (Russia), CDB (PRC), "BELVOR Holdings Ltd." (Cyprus)

Industry
Housing Infrastructure

Region
Kashkadarya region

Terms of implementation
2015-2020

Initiator
Uzbekneftegas JSC

District
Guzar district

Total cost of the project
3 732 900 000 USD

Project capacity

kerosene - 311.0 thousand tons,
diesel fuel - 743.5 thousand tons,
naphtha - 431.1 thousand tons,
liquefied gas - 20.9 thousand tons

Foreign partner / creditor

«Gazprombank» (Russia), CDB, KEXIM/KSURE, EXIAR